激情视频亚洲,成人中文视频,欧美综合视频,欧美第一区第二区

Membrane element maintenance

After a period of normal operation, the membrane element is contaminated by suspended or poorly soluble materials that may be present in the feed water. If the system performance drops by 10% under standard conditions, or if fouling or fouling is apparent, it should be cleaned in time. Regular water rinsing and chemical dosing can restore the performance of the membrane element and extend the life of the membrane element.
During the short-term shutdown of the system, the system should be flushed every 5 days, and the valve should be closed after flushing to prevent fouling.
The system was shut down for a long time (more than 30 days) and 1% sodium bisulfite solution was added to prevent bacterial growth.


Related Documents

Copy right ? 2018 Wuxi Material Science Engineering Co., Ltd. Record number: Su ICP No. 18063596

Hotline

Mrs cheng
18094269893

WeChat 2D code

主站蜘蛛池模板: 吉安市| 宜章县| 米脂县| 茌平县| 昌宁县| 宁津县| 米泉市| 阳江市| 同江市| 苍梧县| 安溪县| 施秉县| 镇原县| 乌海市| 太和县| 常州市| 襄城县| 马鞍山市| 全南县| 霍邱县| 肇州县| 德惠市| 南平市| 平乡县| 那曲县| 乐平市| 思南县| 林州市| 天柱县| 化德县| 武宣县| 香港| 商河县| 麟游县| 永和县| 汕头市| 峨眉山市| 龙里县| 盐源县| 清远市| 桐柏县|